Overview
When Graphic Packaging International expanded its Bristol operations with a new warehouse, the building needed a heating system that could operate reliably across a large, open space with changing airflow and frequent operational activity.
The challenge wasn’t just generating heat, but distributing it evenly and efficiently without disrupting the environment. Alongside that, the wider installation involved new gas mains, electrical integration across multiple systems, and measures to reduce heat loss at key access points. The aim was to create a system that would support comfort, efficiency, and long-term building performance.